Step 5 of 5From ambition to action
From ambition to action
Build and test a contained model. Scale only on evidence.
Commission a small expert team to build and test a shared NHS-owned EHR model in real care, within an agreed scope and budget. This does not authorise national rollout.
The ministerial decision
The proposition is ambitious. The first decision is not.
The roadmap
Build, validate, scale.
- Stage 1
Build
Give one leader authority over a bounded build. Co-design with patients and staff; map costs and contracts, reuse proven components and deliver a testable first release.
Gate: Agreed budget, scope, clinical milestones and evaluation criteria.
- Stage 2
Validate
Test one complete care pathway in diverse localities. Fund training, migration and protected staff time. Compare against baseline and suitable services; publish failures and gains.
Stop: Stop unless independent evaluation demonstrates safety, usability and value.
- Stage 3
Scale
Expand in funded waves, aligned with contract exits and local readiness. Mandate adoption as gates are met; maintain safe interoperability and validate before retiring legacy systems.
Gate: Evidence and delivery capacity continue to support expansion.
Discipline
Funding and ownership.
Keep the first build lean and bounded: a small expert team, proven components and disciplined scope.
Own the direction, not every component. The NHS should control the architecture, standards and roadmap while using proven commercial components where they add value. This limits lock-in, preserves flexibility and keeps accountability with the NHS.
Fund migration, dual running, infrastructure, training and maintenance explicitly. Stage further funding against independently verified safety, usability and whole-life value. Design from the outset to reduce avoidable licensing, procurement, integration and reporting costs.
The previous national IT programme shows why cost, capability and governance must be credible from the outset.Source [5]
Safeguards
Scale safely.
Scale only when the evidence supports it. Require resilient services, tested downtime procedures, role-based access and audit logs. Keep direct-care access separate from research permissions.
Keep common standards while allowing justified specialty workflows. Expand in stages around local readiness and contract exits. Start in England; agree any wider UK adoption with devolved governments.
A shared digital foundation is an enabler, not a substitute for adequate capacity, estates, social care or prevention.
Scope. England is the proposed starting point. Timings, institutional design and incentives are recommendations; no quantified savings estimate is asserted. Sources checked 24 September 2026.
This page sets out a proposal from Fixing the NHS: Break the cycle of decline, an independent policy brief dated 24 September 2026. It is not NHS or government policy. See the evidence and sources or comment on this step.